Categories: Chicago

$21 million announced for infrastructure projects in Cahokia Heights

The city of Cahokia Heights will receive $21 million for infrastructure projects, Gov. JB Pritzker has announced. The funding,  through the Rebuild Illinois Capital Plan, will include rehabilitation of lift stations and improvements to the sewer collection system.

“No community should have to go without clean drinking water and functional waste infrastructure, and our Rebuild Illinois capital plan is investing across the state to correct those inequities,” Pritzker said.

“Today, I’m proud to announce more than $21 million in state funding that will bring 21st century wastewater infrastructure to the Cahokia Heights community. This new investment will upgrade the existing wastewater collection system and prevent the sewage flooding that has become notorious for area residents. This grant is another step toward justice for the Cahokia Heights community.”

Fuding includes a $9.9 million investment in rehabilitation or replacement for approximately 35 lift stations, 5,800 ft. of cured-in-place pipe (CIPP) liner (including 1,500 ft, of sewer line repair), and 3,500 feet of slip lining for the city’s main trunk line.

Lift stations are used in sewer collection systems throughout the country to move wastewater from lower to higher elevations, particularly where the elevation of the source is not sufficient for gravity flow. The rehabilitation needs in Cahokia Heights range from minor repairs, such as control panel repairs, to extensive rehabilitation or full replacement of pumps and structural components.

Slip lining and CIPP liner are trenchless methods to repair leaks or restore the structural stability to an existing pipeline, such as a sewer line. The slip lining improvements made are expected to last between 35 and 50 years.

Funding will also pay for modifications to the wastewater collection system, where many components of the system have exceeded their useful design life. These updates will improve collection efficiency, reliability, and ease of operation and maintenance, helping to prevent flood water from entering the sewer collection system during storm events and relieving stress on the system.

“Stable sewer systems are vital for a functioning community, as anyone without well-maintained sewers can tell you,” said State Representative LaToya Greenwood, D-East St. Louis.

“Especially with high rainfall putting more pressure on our system, our community is seeing overflowing sewers that create unsafe driving conditions, damage to property and general hazards to public health. Rebuild Illinois is living up to its name right now, and I thank Governor Pritzker for such essential support.”

Source: Chicago Construction News

Savion Buehler

Contributor

Recent Posts

Chicago History Museum Workers Ratify First Contract

Workers at the Chicago History Museum ratified their first union contract on August 25, 2026, with 96% of union members…

3 days ago

White Sox, Rangers Battle for Playoff Position

The Chicago White Sox and Texas Rangers head into Wednesday’s series finale at Rate Field with both clubs fighting for…

4 days ago

Chicago Business Expo Returns to Malcolm X College

Chicago will hold its final Business Resource Expo of 2026 on Saturday, Aug. 29, at Malcolm X College, bringing entrepreneurs…

6 days ago

Bedard Signs $75M Deal, Backs Patrick Kane Return

Connor Bedard has secured his long-term future with the Chicago Blackhawks, signing a five-year, $75 million contract extension that will…

1 week ago

Chicago House Music Festival Returns for Four-Day Run

The Chicago House Music Festival and Conference will return Aug. 27 through 30, bringing four days of free performances, dance…

1 week ago

Salmonella Outbreak Linked to Jalapeños Hits 27 States

U.S. health officials are investigating a multistate Salmonella outbreak linked to jalapeño peppers imported from Mexico that has sickened 345…

3 weeks ago

This website uses cookies.